Pakistan Water and Power Development Authority. (2008). Review of feasibility report, engineering design, tender drawings/ documents of diamer basha project: Design report on project civil works executive summary. [y.y.]: [yay. y.].
Chicago Style CitationPakistan Water and Power Development Authority. Review of Feasibility Report, Engineering Design, Tender Drawings/ Documents of Diamer Basha Project: Design Report On Project Civil Works Executive Summary. [y.y.]: [yay. y.], 2008.
MLA CitationPakistan Water and Power Development Authority. Review of Feasibility Report, Engineering Design, Tender Drawings/ Documents of Diamer Basha Project: Design Report On Project Civil Works Executive Summary. [y.y.]: [yay. y.], 2008.
Warning: These citations may not always be 100% accurate.